Department of machines for heatingand oil removal
PPUA-1600/100,Ural KAMAZ-53228 chassis (6×6)
It is a well-organized and multifunctional steam machine. The PPUA-1600/100 (steam generator) is intended for the escape of oil, reservoirs, pipes and other petroleum containers by injecting saturated steam with high (I – 16 MPa mode). It also performs operations for heating, washing equipment, and other works using low pressure saturated steam (modality II to 0.78 MPa), also works easily in conditions of cold climates and fluctuating weather. This machinery represents a special room for steam production in the field conditions.
The unit is mounted on the KAMAZ-53228 (6×6) chassis and is comfortable and fit in other chassis. This unit uses PT-25 pumps and is equipped with a fire extinguisher system. It should be noted that this type of equipment is distinguished by the other because the capacity of steam producing is 2500kg / h and the high pressure capacity (16 Mpa) which makes it useful in many cases where other equipment is less efficient and they will not be able to carry out work.
Construction: The heater is located at the front part near the reservoir in which it is heating; fuel tank 350 l / 2×350 l located near the cold water reservoir; cold water tank 5 cub.m located at the back of the equipment cabin; HIKARIMAI EFG282 pump, control panel inside the driver’s cab; 2 standard doors; 2 pair of stairs; Heat insulation of the floor and the walls with plastic foam 40 mm; wall bracket for tubes, 4,2m х 6 pcs.
ADPM-12/150 (Kamaz-43114 chassis (6×6))
This equipment is intended for the escape of oil in the reservoir by the use of hot oil, under ambient conditions (-45 ° C to +40 ° C). Heating oil and circulating it inside the boiler, the boiler operates at temperatures of 150 degrees Celsius and is capable of heating and circulating 12 m3/hour of oil. The maximum pressure capacity is 16 Mpa. Availability of technology and auxiliary piping gives the possibility to easily connect with oil depots/reservoirs. The machine started to work and warm oil up to the set temperature within 20 minutes from starting. The main pump transmission is independent of that of the pump fuel, and in this way ensures if it is necessary pre-warming of boiler without the startup of distribution pump.
Construction: Heater, fuel pipeline, oil tanker, fuel tank, pump supplier and auxiliary equipment, monitoring system and automatic equipment, automatic fire extinguishing system.